
March 28 through April
Click on the date below each thumbnail to see the photo enlargement.

March 28
Moving the temporary Top Shop to Black Rock.
|

April 2
Final move to the summit.
|

April 3
Temporary shop in place.
|

April 15
Interior almost empty.
|

April 21
Temporary stairway to the Swinging Bridge keeps pedestrians outside
of the construction fence.
|

April 22
Crae watches as demolition equipment makes its way toward the
summit.
|
|
|
|
April 24
And the walls came tumbling down! |
|
Click here to see photos from March-April 2008
Click here to see photos from May-June 2008
Click here to see photos from July 2008
Click here to see photos from August-September-October
2008
Click here to see photos from November-December 2008
-January 2009
Click here to see photos from Spring/Summer 2009
Click here to see photos from Fall 2009
Click here to see photos from Winter 2010
| |
" I had an awesome time, although I was scared to go across the bridge.
"
Jamie Salisbury, NC |
| |
|